HIDROINJEKT Ltd. performs the strengthening in the part of km. 17 + 000 to km. 18 + 070 at Metro Station BUSINESS PARK through the construction of slotted walls with a thickness of 0.60 m with a total area of 12,000 m2 and excavation – 10,000 m3.