Project:

Business park complex BSR - buildings 4 and 5 - phase I

Assignor:

Planex Build Ltd.

Populated place:

Sofia

Year:

2010

Category:

Civil engineering

Business park complex – buildings 4 and 5 are built in Hristo Smirnenski – Slatina, Sofia. The reinforcement is made by means of fence piles with diameter from F 500 mm to F700 mm and maximum depth 14.40 meters and total length 3 980 l.m., foundation piles with casing with diameter from F 800 mm to F 1000 mm with total length 2980 l.m.