HIDROINJEKT LTD participates in the strengthening of Iskarsko Shosse Metro Station – part of the First Metro Diameter of the Sofia Metro, building 2000 m2 of slotted walls under bentonite suspension with a thickness of 0.60 m. waterstop tape, which significantly improves the watertightness of the walls.