Project:
Gypsum dump for gypsum disposal from desulphurization plants of TPP Maritsa Iztok 2 EAD - section 1
Assignor:
Infrastructure Company AD
Populated place:
Kovachevo village, Radnevo municipality
Year:
2013
Category:
Industrial construction
To fulfill the subject of the order, HIDROINJEKT Ltd. performed the following activities: Delivery and laying of HDPE geomembrane 2 mm unilaterally structured – 6350 m2, delivery and laying of HDPE geomembrane 2 mm bilaterally structured – 62200 m2; delivery and laying of HDPE geomembrane 2 mm smooth – 1800 m2; delivery and laying of non-woven drainage geotextiles – 7700 m2. All activities for the implementation of the landfill were completed qualitatively and on time.