HIDROINJEKT LTD. performs the strengthening of Metro Station 18, part of the 3rd metro diameter under the Sofia Metro Expansion Project. More than 3,000 m2 of slotted walls with a thickness of 0.80 m and a maximum depth of 18 meters with a watertight joint have been built.

Assignor: Trace Sofia EAD

Location: Sofia

Year: 2018

Category: Sofia metro