In this project we were assigned the implementation of slotted walls under the protection of bentonite suspension with a thickness of 0.40 m in a closed hall in order to make a vertical shaft for refining copper. Despite the indoor work, which in itself was a great challenge, Hidroinjekt Ltd. managed to perform the assigned work with high quality and on time.

Assignor: Sofia Med AD

Location: Sofia city

Year: 2014

Category: Industrial construction